Water Resource Financing Enterprise
| Type | Bill |
|---|---|
| Session | 2020 Regular Session |
| Subjects |
Concerning the creation of an enterprise that is exempt from the requirements of section 20 of article X of the state constitution to administer a fee-based water resources financing program.
Bill Summary:
The bill creates the water resources financing enterprise (enterprise). The board of the enterprise (board) consists of the board of directors of the Colorado water resources and power development authority and the Colorado water conservation board. The enterprise will provide financing to "water providers", defined to include drinking water suppliers, wastewater treatment suppliers, and raw water suppliers. Raw water suppliers are limited to those that provide raw water for treatment and use as drinking water.
Customers of drinking water suppliers will pay a fee to the supplier, who will transmit it to the enterprise to be used for the financing. The fee is 25 cents per 1,000 gallons of drinking water delivered per month to each metered connection in a drinking water supplier's public water system, collected after the first 4,000 gallons of drinking water delivered per month to an individual metered connection. The board may adjust the fee based on inflation and equity concerns for large nonresidential customers and customers who pay tiered rates that start higher than 4,000 gallons per month.
The enterprise can provide financing for grants, loans, and in-kind technical assistance in arranging third-party financing. In determining whether to provide financing, the board shall consider the following factors:
- A water provider's ability to pay, including whether the water provider has sought or received other financial assistance;
- Whether a water provider is subject to noncompliance or increased requirements related to the provision of raw water, drinking water, water treatment, or wastewater treatment;
- Whether the proposed use of financing relates to a project identified in and in furtherance of the state water plan; and
- The geographic location and demographic characteristics of the water provider and its customers.
- In connection with the provision of raw water, drinking water, water treatment, or wastewater treatment; and
- For feasibility studies, consulting, planning, permitting, and construction of infrastructure and water conservation projects and related recreational, hydroelectric, and flood control facilities, including necessary enlargement and rehabilitation of facilities but excluding maintenance and operation.
(Note: This summary applies to this bill as introduced.)
Prime Sponsors
Senator
Don Coram
Committees
Related Documents & Information
| Date | Version | Documents |
|---|---|---|
| 01/29/2020 | Introduced |
| Activity | Vote | Documents |
|---|---|---|
| Postpone Senate Bill 20-153 indefinitely. | The motion passed on a vote of 3-1. | Vote summary |
| Date | Location | Action |
|---|---|---|
| 02/13/2020 | Senate | Senate Committee on Agriculture & Natural Resources Postpone Indefinitely |
| 01/29/2020 | Senate | Introduced In Senate - Assigned to Agriculture & Natural Resources |