SB17-145

Electric Utility Distribution Grid Resource Acquisition Plan

Concerning modifications to the electric utility resource acquisition process, and, in connection therewith, promoting a more resilient, reliable, and cost-effective electrical grid through enhanced planning and data transparency.
Session:
2017 Regular Session
Bill Summary

The bill directs specified electric utilities to prepare, and the Colorado public utilities commission to review, proposals to integrate distributed energy resources into their plans to acquire new infrastructure. 'Distributed energy resources' is defined to include renewable distributed generation facilities, such as rooftop solar, energy storage facilities, electric vehicles, and other features of an improved and diversified electrical grid architecture. The commission may approve the plans as submitted or modify them in ways that improve system reliability, reduce costs, or increase the benefits to ratepayers.


(Note: This summary applies to this bill as introduced.)

Status

Introduced
Lost

Menu

Bill Text

Sponsors

Sponsor Type Legislators
Prime Sponsor

Sen. S. Fenberg
Rep. M. Foote

Sponsor

Co-sponsor

Colorado legislature email addresses ending in @state.co.us are no longer active. Please replace @state.co.us with @coleg.gov for Colorado legislature email addresses.  Details