Skip to main content
Colorado General AssemblyToggle Main Menu
Agency NameToggle Agency Menu
Interim Committee Interim Committee

Cell Phone Connectivity Interim Study Committee

Bill Designation

Bill Designation Bill Topic Former Bill Designation Fiscal Note Introduced Bill
Bill A Single Point of Contact Wireless Services Bill 1 Bill 1 SB 25-031
Bill B Wireless Telephone Infrastructure Deployment Incentives Bill 2 Bill 2 HB 25-1080
Bill C Local Government Permitting Wireless Telecom Facilities Bill 3 Bill 3 HB 25-1056

Bills Not Referred to Legislative Council

Bill Designation Bill Topic Fiscal Note
Bill 4 Telecommunications Infrastructure Theft Detterence Bill 4

The effective date for bills enacted without a safety clause is August 6, 2025, if the General Assembly adjourns sine die on May 7, 2025 (unless otherwise specified). Details

Our website is currently undergoing a redesign in order to provide a better experience for everyone. View the Beta site

The House of Representatives and Senate will not convene on Monday, February 17 in observance of Presidents' Day